As of August 2024, International Journal "Notes on Intuitionistic Fuzzy Sets" is being indexed in Scopus.
Please check our Instructions to Authors and send your manuscripts to nifs.journal@gmail.com. Next issue: September/October 2024.

Open Call for Papers: 22nd International Workshop on Intuitionistic Fuzzy Sets and Generalized Nets • 18 October 2024 • Warsaw, Poland / online (hybrid mode).
Deadline for submissions: 1 October 2024.

Issue:An intuitionistic fuzzy generalized net for optimal scheduling of ore handling processes at a sintering plant

From Ifigenia, the wiki for intuitionistic fuzzy sets and generalized nets
Revision as of 17:09, 14 August 2024 by Vassia Atanassova (talk | contribs) (Created page with "{{PAGENAME}} {{PAGENAME}} {{PAGENAME}} {{PAGENAME}} {{issue/title | title = An intuitionistic fuzzy generalized net for optimal scheduling of ore handling processes at a sintering plant | shortcut = nifs/4/3/85-91 }} {{issue/author | author =...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
shortcut
http://ifigenia.org/wiki/issue:nifs/4/3/85-91
Title of paper: An intuitionistic fuzzy generalized net for optimal scheduling of ore handling processes at a sintering plant
Author(s):
Idilia Batchkova
University of Chemical Technology and Metallurgy, "Kl. Ochridski" 8 Str., Sofia, Bulgaria
nchrist@adm1.uctm.acad.bg
Peter Georgiev
CLBME - Bulgarian Academy of Sciences, bl.105 Acad.G. Bontchev Str., 1113 Sofia, Bulgaria
prg@bgcict.acad.bg
Valentina Radeva
CLBME - Bulgarian Academy of Sciences, bl.105 Acad.G. Bontchev Str., 1113 Sofia, Bulgaria
Published in: "Notes on Intuitionistic Fuzzy Sets", Volume 4 (1998) Number 3, pages 85—91
Download:  PDF (4641  Kb, File info)
Abstract: The optimal scheduling of iron ore handling processes is a main control object by redesign of integrated control system at the Sintering plant. A main technological problem is a high level of internal and external disturbances connected with the transport, iron ore contents, unforseen faults. An Intuitionistic Fuzzy Generalized Nets (IFGN) approach for optimal scheduling of iron ore delivering, discharge and blending yards creation have been proposed and tested. The IFGN contains 5 transitions and 18 places with different priorities and infinite capacities. The IFGN model is realized in the frames of a current version of the object oriented Software Tools for Generalized Nets.
Keywords: Scheduling, Intuitionistic Fuzzy Generalized Nets, Man-machine systems, Sintering plant, Optimization.
References:
  1. Adams J., Balas E. and Zawck D.(1988), The shifling bottleneck procedure for job shop scheduling, Management Science, vol.34, n.3, pp.391 - 401.
  2. Atanassov K. (1991), Applications of Generalized Nets., World Sciences, Singapore - New Jersey - London - Hong Kong.
  3. Bachkova I., Danev S., Atanassov K.(1997), A Generalized Net Model for Optimization in a Thermal Power Plant, DYCOMANS, Third International Workshop on Information Processing and Control in Power Generation, May 22 - 23, Varna, Bulgaria.
  4. Bachkova I.(1998), Optimal scheduling of iron ore discharge and blending yard creation at a Sintering plant using Generalized Petri nets, 8th JFAC/FORS/IMACS/IFIP Symposium in Large Scale Systems: Theory & Applications, 15 - 17 July, Patras, Greece.
  5. Capcovic F.(1994), A Petri net - based approach to synthesis of control systems for discrete event dynamic systems., in IFAC’94, pp.398 - 403, Smolenice.
  6. Hruz B. (1994) The supervisory control problem solved via Petri nets., In: IFAC’94., pp. 386 - 391 Smolenice.
  7. Hintz (1987), Ein wissensbasiertes System zur Produktionsplannung und Steuerung fuer flexible Fertigungssysteme., VDI - Verlag, Ducsscldorf.
  8. Hoitomt D., Luh H. and Pattipati R. (1993), A practical approach to job shop scheduling problems, JEEE Transactions on Robotics and Automation, vol.9, n.1, pp.1 - 13.
  9. Holloway C. and Nelson R. (1974), Job shop scheduling with due dates and variable processing times, Management Science, vol.20, n.9, pp.1264 - 1275.
  10. Lawer E. (1973), Optimal sequencing of a single machine subject to precedence constraints, Management Science, vol.19, pp.544 - 546.
  11. Ramos C., Almeida A., Vale Z. (1995), Scheduling Manufacturing Tasks considering Due Dates: a new method based on behaviors and agendas, International Conference of Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, Melbourne, Australia.
Citations:

The list of publications, citing this article may be empty or incomplete. If you can provide relevant data, please, write on the talk page.