Please check our Instructions to Authors and send your manuscripts to nifs.journal@gmail.com. Next issue: September/October 2024.
Deadline for submissions: 16 November 2024.
Issue:Digital transformation project selection using Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS: Difference between revisions
Jump to navigation
Jump to search
Created page with "{{PAGENAME}} {{PAGENAME}} {{PAGENAME}} {{issue/title | title = Digital transformation project selection using Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS | shortcut = nifs/28/3/211-222 }} {{issue/author | author = Başar Öztayşi | institution = Department of Industrial Engineering, Istanbul Tech..." |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
{{issue/title | {{issue/title | ||
| title = Digital transformation project selection using Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS | | title = Digital transformation project selection using Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS | ||
| shortcut = nifs/28/3/ | | shortcut = nifs/28/3/334-342 | ||
}} | }} | ||
{{issue/author | {{issue/author | ||
Line 14: | Line 14: | ||
}} | }} | ||
{{issue/author | {{issue/author | ||
| author = Sezi | | author = Sezi Çevik Onar | ||
| institution = Department of Industrial Engineering, Istanbul Technical University | | institution = Department of Industrial Engineering, Istanbul Technical University | ||
| address = Besiktas, Istanbul, Türkiye | | address = Besiktas, Istanbul, Türkiye | ||
Line 28: | Line 28: | ||
}} | }} | ||
{{issue/author | {{issue/author | ||
| author = | | author = Selçuk Çebi | ||
| institution = Department of Industrial Engineering, Istanbul Technical University | | institution = Department of Industrial Engineering, Istanbul Technical University | ||
| address = Besiktas, Istanbul, Türkiye | | address = Besiktas, Istanbul, Türkiye | ||
Line 36: | Line 36: | ||
{{issue/data | {{issue/data | ||
| conference = 25<sup>th</sup> [[ICIFS]], Sofia, 9—10 September 2022 | | conference = 25<sup>th</sup> [[ICIFS]], Sofia, 9—10 September 2022 | ||
| issue = [[Notes on Intuitionistic Fuzzy Sets/28/3|Notes on Intuitionistic Fuzzy Sets, Volume 28 (2022), Number 3]], pages | | issue = [[Notes on Intuitionistic Fuzzy Sets/28/3|Notes on Intuitionistic Fuzzy Sets, Volume 28 (2022), Number 3]], pages 334–342 | ||
| doi = https://doi.org/10.7546/nifs.2022.28.3. | | doi = https://doi.org/10.7546/nifs.2022.28.3.334-342 | ||
| file = NIFS-28-3- | | file = NIFS-28-3-334-342.pdf | ||
| format = PDF | | format = PDF | ||
| size = | | size = 486 | ||
| abstract = Digital transformation necessitates fundamental changes in business processes, business models, and even cultures of the companies. DT projects provide a substantial value to the business competition and effect their market shares. In order to reach these results, digital transformation projects should be carefully analyzed and evaluated. In this paper, we focus on digital transformation project prioritization problem under multiple criteria. Just like many other technology related decisions, digital transformation problems are inherently uncertain, which leads researchers to employ the fuzzy set theory. Interval Valued Type-2 Intuitionistic Fuzzy Sets (IVT2IFS) are a relatively new extension of fuzzy sets which take into account membership and non-membership values as an interval. In this paper, we utilize Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS method for a digital transformation project prioritization problem and apply the model to a real-world example. | | abstract = Digital transformation necessitates fundamental changes in business processes, business models, and even cultures of the companies. DT projects provide a substantial value to the business competition and effect their market shares. In order to reach these results, digital transformation projects should be carefully analyzed and evaluated. In this paper, we focus on digital transformation project prioritization problem under multiple criteria. Just like many other technology related decisions, digital transformation problems are inherently uncertain, which leads researchers to employ the fuzzy set theory. Interval Valued Type-2 Intuitionistic Fuzzy Sets (IVT2IFS) are a relatively new extension of fuzzy sets which take into account membership and non-membership values as an interval. In this paper, we utilize Interval Valued Type-2 Intuitionistic Fuzzy TOPSIS method for a digital transformation project prioritization problem and apply the model to a real-world example. | ||
| keywords = Digital transformation, Interval Valued Type-2 Intuitionistic Fuzzy Sets (IVT2IFS), TOPSIS, Project selection. | | keywords = Digital transformation, Interval Valued Type-2 Intuitionistic Fuzzy Sets (IVT2IFS), TOPSIS, Project selection. |
Latest revision as of 20:15, 1 July 2024
shortcut
|
|